Quick Link
Quick Contact
Address
No. 1707, Industrial Road, Tangshan Town, Huantai County, Zibo City, Shandong Province
Tel
86-533-17860959591
Our Newsletter
Subscribe to our newsletter for discounts and more.
WD PUR Hot Melt Adhesive for Woodworking Flat Lamination
Problem | Why Is Further Testing Needed After Initial Setting?
Wood flat lamination requires both suitable processing speed and bond performance after curing. WD provides initial strength after cooling to support subsequent operations. However, the fact that the laminated surfaces hold together does not indicate full cure. Cooling and final curing should be distinguished when assessing heat and water resistance.
Cause | Initial Strength and Cured Properties Develop at Different Stages
WD uses a moisture-reactive polyurethane hot melt system. Cooling after application helps establish initial positioning, while moisture curing contributes to subsequent property development. The document describes heat and water resistance after full cure. These descriptions should not be applied directly to the adhesive immediately after pressing.
Solution | Establish Trial Conditions Around Coating and Pressing
Record the substrates, actual application temperature and interval before pressing during selection trials. WD has a melt viscosity of 15,000±3,000 mPa·s at 120°C; the temperature must accompany the quoted value. The stated open time is 4±2 minutes, but the test conditions are unspecified. Confirm the production sequence through lamination trials.
Application | Wood and WPC Board Flat Lamination
The document identifies wood flat lamination and specifically lists WPC board flat lamination. The stated peel force on PVC of ≥40 N/25 mm can serve as a reference for relevant testing. However, the complete laminated construction is not specified, so the value does not establish suitability for every PVC film and board combination. Specific material combinations require validation.
How It Works | Why Does Equipment Sealing Matter?
The adhesive cures through a reaction with moisture. The document therefore calls for attention to dispensing equipment sealing and advises against prolonged exposure to air after opening. Adhesive supply arrangements should match the processing sequence to reduce unnecessary open exposure.
FAQ | Does Testing After 24 Hours Mean Full Cure Has Been Reached?
No. The document recommends testing assembled panels after 24 hours but does not specify a full-cure time. It also gives two application temperature ranges: 110–150°C and 120–150°C. Clarification is required before use. Temperatures above 150°C may deform PVC film.