logo

20kg 170kg Drum Bulk Polyurethane Bonding Hot Melt Adhesives For Packaging

Place of Origin: China
Brand Name: YT
Certification: ISO9001,
Model Number: Hot Helt Adhesives
Inquiry Now
Get A Quote
Specifications
Highlight Features

polyurethane hot helt adhesives

,

hot helt adhesives 20kg/drum

,

170kg/drum hot melt adhesive glue

Product Name:
PUR Hot Melt Adhesive For Woodworking Flat Lamination
Chemistry And Cure:
Reactive Polyurethane Hot Melt Adhesive; Moisture-curing
Melt Viscosity:
15,000±3,000 MPa·s At 120°C; ISO 3219
Open Time:
4±2 Min
Application Temperature:
120–150°C In The Specification Table; 110–150°C In The Operating Instructions; Clarification Required
Peel Force On PVC:
≥40 N/25 Mm
Solids Content:
100%
Application:
Wood Flat Lamination And WPC Board Flat Lamination
Product Description

PUR Hot Melt Adhesive for Woodworking Flat Lamination | Adhesive for Wood and WPC Boards

 

Product Overview

 

WD is a moisture-curing reactive polyurethane hot melt adhesive with 100% solids, primarily intended for woodworking flat lamination, including WPC board flat lamination. It provides initial strength after application and cooling to support subsequent processing, with heat and water resistance after full cure.

 

Problem | Why Is Peel Force Alone Insufficient for WPC Board Lamination Selection?

 

Adhesive selection for flat lamination requires consideration of the material combination, coating conditions and processing sequence. The WD document states a peel force on PVC of ≥40 N/25 mm but does not provide the complete specimen construction or test conditions. This value alone cannot establish suitability for a specific facing material and board combination.

 

Cause | Performance Values Must Be Read with Their Test Materials and Conditions

 

Peel force on PVC cannot replace testing of other material combinations. Similarly, the melt viscosity of 15,000±3,000 mPa·s is measured at 120°C and should not be treated as a fixed viscosity across different application temperatures. Parameters provide useful references for trials only when their associated conditions are retained.

 

Solution | Define the Material Combination Before Recording Process Conditions

 

Before trials, identify the board and facing materials. Record the actual application temperature, interval between coating and pressing, and waiting period before testing. The documented open time is 4±2 minutes, but its test conditions are unspecified. The actual production window therefore requires validation rather than treating this value as a fixed waiting period.

 

Technical Specifications

 

Parameter

Value or Description

Chemical Composition

Reactive polyurethane hot melt adhesive

Curing Mechanism

Moisture-curing

Solids Content

100%

Color

Water-white

Density

1.1±0.05 g/cm³

Melt Viscosity

15,000±3,000 mPa·s

Open Time

4±2 min

Softening Temperature

85±5°C

Application Temperature

120–150°C in the specification table; 110–150°C in the operating instructions

Peel Force on PVC

≥40 N/25 mm

Packaging

20 kg/drum or 170 kg/drum

Storage Conditions

Cool, dry conditions at 10–25°C

Shelf Life

6 months in original packaging

 

Application | Wood and WPC Board Flat Lamination

 

The document explicitly identifies wood flat lamination and lists WPC board flat lamination. Processes involving PVC film require further confirmation of the complete material combination. The PVC peel-force value and temperature warning do not establish that every PVC film lamination arrangement has been validated.

 

How to Choose | Check Both Application Temperature and Cure Status

 

The document gives application temperature ranges of 110–150°C and 120–150°C. Clarification is required before use. For processes involving PVC film, temperatures above 150°C may cause deformation. Initial strength after cooling should also be assessed separately from heat and water resistance after full cure.

 

FAQ | Does Waiting 24 Hours After Assembly Establish Full Cure?

 

No. The document only recommends carrying out relevant tests after a 24-hour waiting period; it does not specify a full-cure time. The softening temperature of 85±5°C also does not establish the heat-resistance limit after curing. Specific service-temperature requirements need appropriate test evidence.

Related Products
Send An Inquiry